BACKGROUND
Initially the Sabie River area was known as
an excellent hunting area, and was used as a rest camp by game hunters and prospectors.
The name "Sabie" is derived for "Sabielala", which means "Sabie,
the resting place", or from "Saba", meaning fear. The Sothos and
Swazi's in the area gave this name to the river because they feared the spirits of people
who drowned there or whose bodies were thrown into the river during the continual wars
that were waged, at that time.
In 1846 the magistrate at Ohrigstad issued
the first transport acts to P.J. Badenhorst of the farm "Grootvantijn". He sold
the farm to P. de Villiers, who sold it in 1880 to H.T.Glynn (1856-1928), the founder of
Sabie. Early in 1871 Tom McLachlan, James Sutherland and Edmond Button discovered the
first alluvial gold on the farm Spitzkop in the Sabie area. In April and June 1973 more
gold was found at Hendriksdal and at MacMac. However, with the discovery of gold at
Pilgrims Rest that same year, followed by discoveries at Barberton in 1884 and on
the Witwatersrand in 1886, most prospectors left the Sabie area. Glynn continued his
search, until a reef was discovered in 1897, later known as the Glynns Lydenburg
mine. Between May 1897 and July 1950 3 427 784 tons of ore was mined, 1 240 646 ounce of
gold produced and a profit of R4 234 664 was made.
From 1881 established companies, the most
notable being Transvaal Gold Mining Estates, Ltd. (TGME) and Messrs. Glynns
Lydenburg Ltd., took over the mines and converted from alluvial mining to reef mining.
Small operators also continued mining and even after the First World War (1914-1918) a
number of small mines were still operating in the district.
FOUNDING OF SABIE RIVER GORGE POWER STATION
Shortage of electrical power in the dry
season at Sabie seriously restricted normal mining operations, since the mines could not
be pumped dry. Any further development was also hampered by the absence of an adequate and
reliable power supply. One of the large mining companies owned a small hydro-electric
station at the foot of the Sabie Falls, which supplied power to its own mines and others
according to a priority allocation laid down by the Department of Mines and Industries.
However, the total power available was inadequate to meet the requirements of all the
mines and the smaller properties could not afford to provide their own power. Furthermore,
power production had to be concentrated to be produced economically.
Repeated representations were made to the
Government to establish a power station that would cater for the growing needs of the
numerous small mines. A Government Departmental Committee was formed in 1920 to look into
the matter and shortly after the establishment of the Electricity Supply Commission in
1923, the matter was referred to the Commission as one of urgency. The establishment of a
power station at Sabie was one of the first projects undertaken by the Commission.
On 7 August 1923 members of the Commission
visited the Sabie District to investigate the different proposals which had been made over
the years and also to hear the views of the local community on the power situation. Survey
work to establish a hydro-electric power station in the Sabie Valley, at a place known as
"the inaccessible gorge", was started shortly afterwards.
When construction work was ready to start,
the mines found that their power requirements were likely to be considerably less than
first estimated, and the scheme had to be reconsidered. Because the mining industry could
not give a guarantee of a possible future load, the Commission had to abandon the larger
scheme in favor of a smaller operation. A site closer to Sabie had to be found in order to
cheapen the cost of transmission. Survey work started in June 1924 on the farm Bergvliet
692, 14 km down stream from Sabie on the Sabie River. Early in 1925, tenders were invited
for the supply and construction of the plant. On 5 June 1925 a permit was obtained from
the Electricity Control Board for the establishment of a hydro-electric undertaking in the
Sabie District and an application was made to the Water Court for the necessary water
rights on the Sabie River.
MALIEVELD
SPRUIT POWER STATION
While the Sabie River scheme was being
revised, it was found to be necessary to install a small hydro-electric plant on the
Malieveld Spruit to prevent flooding of the mines during the winter season. This power
plant was erected in collaboration with Glynns Lydenburg Ltd. and started production
on 1 December 1925. When the Sabie River Gorge scheme was completed in 1927, the Malieveld
Spruit plant was closed. Initially it was considered to use the plant as a stand-by, but
it was dismantled after the closure.
SABIE
RIVER IN OPERATION
The Sabie River Gorge station was the first
station to be designed by Escom engineers. The Sabie undertaking was the first project
where Escom generated its own electricity after its establishment and it was, until the
Hendrik Verwoerd Power Station began to generate power in 1971, the only hydro-electric
power station erected by Eskom. The scheme started up provisionally for testing in March
1927 and commercial operation started on 1 April 1928. The licensed supply/delivery area
was within a 14 km radius from the Sabie Railway Station. This excluded the areas under
jurisdiction of the municipality, unless the Commission obtained permission from the local
authorities for the supply of electricity.
The Sabie Undertaking consisted of :
- a hydro-electric power station in the Sabie
River Gorge with an installed capacity of 1.350kW, made up of three generating sets of 450
kW each. Two were initially in production the third only operating in emergencies
but in 1944 the mining companies requested that all three sets run when sufficient
water was available. To enable this a force-air cooling on the step-up transformer at the
power station was installed and the mining companies had to provide devices for improving
the power factor of their load. Three 55 kW 600 kV 750 rpm Francis turbines and
alternators operating under a static head of 64 meters generated electricity. The system
of generation was in three phases with 50 cycles, generating 3 300V.
- A 22.000V transmission line, over 11,4km,
from the power station to a distribution sub-station near Sabie Township. (Illustration:
1929 Annual Report)
- A 3.300V distribution line, over 3,5km, from
the distribution sub-station to the consumers in the Golden Valley area.
- Four step-up and step-down transformers
working at the power station with one spare, as well as six working and one spare on the
transmission and distribution lines. (Illustration: 1928 Annual Report)
CIVIL WORKS
Division weir and intake works
(Illustrations: Annual Reports 1926, 1928)
Sand trap at weir (Illustration: Annual Report 1927)
Settling basin at intake works (Illustration: Annual Report 1928)
Power Station (corrugated iron building) (Illustrations: Annual Reports 1926, 1929: gorge
with power station in middle distance, 1930)
Pipe line: 105cm pressure pipe dropping 1542 meters to gorge below (Illustrations: Annual
Reports 1926, 1927)
One of the aqueducts (Illustration: Annual Report 1927)/ canals 3891 meters
Tunnels: 13 146 meters
OUTPUT
According to the Annual Report of 1930, the
Sabie Undertaking was designed for an output of approximately 5,5 million units per year.
Up to 1930 the electricity demand was far less than the maximum output. A yearly increase
of +/- 40 % can however be noted from 1928 onwards, and in 1931 the output was exceeded
and 6,585 553 million units were sold. As the units sold increased, the average price per
unit decreased and the consumers had to pay only 66% of the estimated price. The reason
for this is because production costs of hydro-electric schemes are affected only to a
limited extent by the output. Any increase in consumer demand has very little impact on
the operating expenditure and results in a substantial reduction in the average cost per
unit.
The output peaked in 1947 when 7,604 777
units were produced. After 1947 a steady decline in output can be observed, with the
exception of 1963 and 1964. The reason for this can be attributed to the fact that the
town of Graskop was connected to the Sabie River Gorge scheme. After the closure of the
plant on 5 November 1964 a sharp drop in output occurred. By 1967, only 17 000 units were
produced. The 1968 Annual Report only mentions that the power station was used as a
standby for emergencies. After 1971, with the completion of the Hendrik Verwoerd power
station, the Sabie scheme was no longer noted in the Annual Report and also excluded on
the map of the Eastern Transvaal Undertaking.
CLOSURE OF
SABIE
The closure of the Sabie River Gorge Power
Station in 1964 had little effect on the economy as well as the electricity supply in the
area. A very small staff manned the station, so few people were affected by the closure.
The area was initially developed by TGME for mining purposes, and forestry was undertaken
on a small scale, to provide the necessary support beams used in the mines shafts. During
the depression years (1929-1932) the government started forestry schemes in the area to
provide work for the dislocated farmers and poor whites. By 1948 the profit made from
forestry far exceeded that of the mining industry and became the most important economic
activity.
South African Forest Investments, the
biggest private forestry company in South Africa, which was founded in 1948, was not
dependent on the Sabie River Gorge scheme for its power (a saw mill at Graskop drew
power from the station from 1963, but there is no indication what the situation was after
1964). The Eastern Transvaal had huge coal deposits and plenty of water, which was ideal
for the development of coal-fired power stations. Komati Poort was completed in 1961,
followed by Camden, Hendrina, Arnot and Kriel Power Stations. In the sixties a network of
transmission lines was also constructed in the Eastern Transvaal, from which the Sabie
Area could get its power.
STAFF
No information could be found on the
staffing of the Sabie River Gorge Power station prior to 1932. In 1932 Raoul Martin joined
Escom and was appointed as Senior Engineer-in-charge at the Sabie River Station.
Jean Benoit Raoul Martin was born on 15
December 1880 in Port Louis, Mauritius, and came to Pretoria, the capital of the
Zuid-Afrikaansche Republiek, in 1893. With the outbreak of the Second Anglo Boer War
(1899-1902) he joined General Louis Bothas forces as a telegraphist with the
"Staats Artillerie". He was captured in 1901 at the Battle of Hlobane, which
took place near Vryheid and was sent to the prison camp at Ladysmith, called "Tin
Town". He was sent as POW to Sialkot and Fort Ahmedrager, in the province of
Amnitsar, India.
After the war Martin was expatriated to
France, where he applied to an international fund in aid of Boers for bursaries in
electrical engineering. After having completed his studies, he returned to South Africa in
1930. Up to his retirement in 1962, he was in charge of the Sabie River Gorge Power
Station. He moved to Parktown where he died on 6 May 1964 in the Edenvale Hospital, aged
83. He was married to Marie-Antoinette and they had two daughters, Monique Beley and
Nicole Monique Jacqueline Franck. No records could be found on the staff situation after
his retirement. In the Annual Report of 1946 it is mentioned that a small community was
situated at the Power Station, which might indicate that other staff was also employed.
The white community in the Sabie-Pilgrims
Rest area at the time consisted on the one hand of an English-speaking community with
strong ties with Britain. The Pilgrims and Sabie News are filled with reports
of cricket matches, Victoria and St Georges day celebrations and Empire pageants. In
his book Game and Gold HT Glynn refers to the British Empire as the greatest empire
in the world and sees it as his duty to uphold this empire and the Union Jack in this
remote part of South Africa.
The Afrikaans-speaking community only
started to grow during the depression when the government forestry project was started.
According to one of the ministers of the "Nederduits Hervormde Kerk" these
people were not only extremely poor, but illiterate as well.
Noting his role the Anglo-Boer War, one can
assume that Martin was not pro-British. It would have been interesting to know what social
life the Martins lead at Sabie.
TIME LINE
| 1920 |
A Government Departmental
Committee is formed to look into the establishment of a Government Power Station to meet
the needs of the numerous small mines in the Sabie District. |
| 1922 |
September: The Electricity
Act, no. 42 of 1922 is passed. |
| 1923 |
6 March: The Government
Gazette announced the establishment of the Electricity Supply Commission (Escom) with
dr H.J. van der Bijl as chairman. The establishment of a power station in the Sabie
District is referred to the Commission as one of urgency. On 7 August, members of the Commission visit the Sabie District
to investigate the possibility of the establishment of a power station.
Survey work for a hydro-electric station in
the Sabie valley is started. |
| 1924 |
Construction work is delayed
because of a reconsideration of the mines power requirements. A site closer to Sabie
has to be found to cheapen the cost of the transmission system. In June survey work is started anew on the farm
Bergvliet |
| 1925 |
On 5 June a permit is
obtained from the Electricity Control Board for the establishment of a hydro-electric
undertaking, as well as a permit for the necessary water rights on the Sabie River from
the Water Court. |
| November: |
Owing to the delay in
construction of the Sabie River Gorge Power Station, a small hydro-electric plant is
installed on the Malieveld Spruit to ensure an adequate power supply to the district
during the dry winter season. |
| 1927 |
In March the Gorge scheme is
started up provisionally for testing. The
Sabie rivers water level drops because of a drought, and according to the Annual
Report of TGME a Lanz Diesel engine is used to supplement the power supply.
In May the Malieveld Station ceases
operation. |
| 1928 |
On 1 April the Sabie River
Gorge Power Station is placed in commercial operation. During the summer, two exceptionally severe hailstorms are
experienced, causing considerable damage to the buildings of the power station. On the one
occasion the large amount of debris washed down the canal causes an involuntary shutdown
of the power station. |
| 1930 |
Early in 1930 one of the
three mining companies at Sabie discontinues mining activities and goes into liquidation.
The two remaining consumers have previously generated a considerable amount of their
electricity at a power station of their own. With the closing down of the one mine, they
decide to draw all their power from the undertaking, which leads to a large increase in
the output of the Sabie River Gorge Power Station, and a subsequent reduction in cost. |
| 1936 |
A roadway to the power
station is built. |
| 1943 |
Due to the war, sales to
industry decrease throughout South Africa. The Sabie plant experiences a drop in demand of
6,4%. |
| 1944 |
At the request of the mining
companies, the third 450 kW set which is kept as standby, is also used when sufficient
water is available. For this reason a forced-air cooling system is installed on the
step-up transformers at the power station. The waterways, originally designed to convey
water for low load on the machines, have to be modified at some points to ensure that the
water pressure is sufficient to run an additional generator. The mines abandon the practice of dumping "tailings"
(waste left over from some industrial process) into the river, resulting in a cleaner
supply of water to the station and the probable prolongation of the life of the wearing
parts. |
| 1946 |
January: heavy floods are
experienced at the power station, but no considerable damage is caused. The floods,
however, isolate the community at the power station completely from the village for 48
hours. |
| 1947 |
The capital expenditure is
paid off, which enables the Commission to sell electricity at a reduced cost. This is in
accordance with the Electricity Law, according to which separate bills are kept for each
undertaking. |
| 1948 |
VFP assets are taken over by
Escom.
H.J.van der Bijl dies in December.
Mr A.M.Jacobs is appointed as chairman |
| 1950 |
The two gold mines, supplied
with power by the Undertaking, amalgamate. The remaining consumer takes the total output
at cost. In terms of the Sabielicenceof 1923 the contract is subject to termination by the
consumer giving12 months notice. A
severe drought is experienced which leads to a decrease of 10,3% in power generation. |
| 1951 |
Dr J.T.Hattingh is appointed
as chairman |
| 1957 |
Notice is given by the
Transvaal Gold Mining Estates, Ltd. to terminate the contract on 30 June 1958. |
| 1958 |
On 1 July the Sabie River
Gorge Power station is incorporated in the Eastern Transvaal Undertaking. Seventy-seven
domestic and business consumers and three larger users in the Sabie village are provided
with power. |
| 1960 |
Major development of coal
fired power stations in the Eastern Transvaal is planned. Power stations developed during
this decade include Camden, Hendrina, Arnot and Kriel. |
| 1962 |
Dr R.L.Straszacker is appointed as chairman A scheme is planned to erect a 21 kV power line between Sabie and
Graskop, where 70 residents have accepted Escoms conditions. Escom will take over
the reticulation system at Graskop and it will be reconstructed to provide power to more
consumers, including a sawmill. |
| 1963 |
The Graskop-Sabie scheme
starts operation. In the Escom Annual
Report mention is made of the Sabie Gorge and Sabie Waterfall Power Stations |
| 1964 |
The power station is shut
down on 5 November. |
| 1968 |
The power station is
mentioned as a standby for emergencies. |
| 1971 |
The Hendrik Verwoerd
Hydro-electric scheme is completed. |
|
|
SOURCES
Escom Annual Reports 1924-1971The
Megawatt Journals
Escom 50 Years
Lantern Jaargang xxxxi no 2, 1982.
The Pilgrims and Sabie News
1924-1954.
Bartman, T. (red.), Die herdenking van die
50ste bestaansjaar van die Nederduits Hervormde Kerk, Sabie.
[ BACKGROUND I FOUNDING OF SABIE RIVER POWER
STATION I MALIEVELD
SPRUIT POWER STATION I SABIE
RIVER IN OPERATION I CIVIL WORKS I OUTPUT I CLOSURE OF
SABIE I STAFF I TIME LINE I SOURCES
I www.sabie.co.za ]
|
| This
webpage was last updated on the 07 November, 2003 |
|